RICK was contracted to perform civil engineering design services for this 2.7-acre, $1.9 million University of Arizona facility. The project consisted of replacing the existing east Student Recreation Center parking lot and Cherry Avenue with a multiuse athletic field, grading for a future 12-foot pedestrian corridor along the east side of the site, and enhancing streetscape improvements to 6th and 7th Streets, incorporating LID and stormwater quality features.
Specifically, RICK prepared demolition plans, surface grading, paving and drainage plans, private reclaimed water plans, potable water and private sewer plans, and storm water pollution prevention plans to facilitate this project. All of the design conformed with the University of Arizona DSS and ADA design guidelines.